Location: Kaliningrad region, Gusev town
Period of work: 2009
Total volume of work: Construction of health and fitness centre with the area more than 12,000 m2.
Completed scope of work: Earth work, foundations construction, electrical installation work, laying of the internal utilities and mechanical services, ventilation and air conditioning systems, landscaping and roads, finishing works, exterior lighting.

Location: Kaliningrad region, Gusev town
Period of work: 2007-2009
Total volume of work: Design and turnkey construction of the plant. Total area – 14,000 m2.
Completed scope of work: Civil works, works of laying of the internal and external utilities and mechanical services, installation of the equipment.

Location: St. Petersburg, Kamenka village
Period of work: 2008-2009
Total volume of work: Construction of the plant
Completed scope of work: Utility networks: storm water drainage, treatment facilities and exterior lighting. Construction of the Test Track. Construction of the finished product areas.

Location: St. Petersburg, Shushary village
Period of work: 2006-2007
Total volume of work: Construction of the plant
Completed scope of work: Driving of sectional piles with welded joint with the total length of 23-28 m in quantity 100 000 running meters and grillages installation.

Location: St. Petersburg, Fontanka river embankment, 203
Period of work: Construction of a workshop preparing ship sections.
Total volume of work: The building is equipped with different plumbing installation and systems. Works on the construction of a special-purpose rail track were also executed.
Completed scope of work: 2007
Period of work: 2001-2003
Completed scope of work: Construction of a sheet-pile enclosure for navigation canals, buildings’ foundations, utility systems in cottages for VIPs.

Location: St. Petersburg, Olgino village
Period of work: 2001
Total volume of work: Foundation construction for tower-cooler, pile foundation for the main building
Completed scope of work: Works on foundation construction for tower-cooler and pile foundation for the main building.

Location: St. Petersburg, Futchika st., 4
Period of work: 2008 – 2009
Total volume of work: Design and turnkey construction
Completed scope of work: Design and survey work, construction and installation work, laying of the cable line 110 kv.

Location: Kaluga
Period of work: 2009-2010
Total volume of work: Design and turnkey construction of the plant
Completed scope of work: Civil works, laying of internal and external utilities and mechanical services, installation of equipment.

Location: Gusev, Kaliningrad region
Period of work: 2007-2008
Total volume of work: Design and turnkey construction of the plant. Area – 6,000 m2.
Completed scope of work: Civil works, laying of internal and external utilities and mechanical services, installation of equipment.

Location: Leningrad region, Vsevolozhsk town, industrial area Kirpichny zavod, building No.1
Period of work: 2007 – up to the present time
Total volume of work: Design and construction of projects within the production facilities extension of the plant
Completed scope of work: Construction of the finished product areas S=25,000m2. Construction of storage, office and industrial premises, installation of the utilities and mechanical services (ventilation, air-conditioning, heating, water supply, fire prevention, compressed air systems). Construction of the filling complex.

Location: St. Petersburg, Moscow administrative district , Aviagorodok, block 8
Period of work: 2005-2007
Total volume of work: Turnkey construction of service and industrial complex
Completed scope of work: Design, geological surveys, foundation piling, construction of brick and cast-in-situ building, laying of internal and external utilities and mechanical services, finishing works